Procedures for Investment in the Energy

 

Download the brochure of "Licensing and permitting requirements for renewable energy"


Steps to be followed and the institutions responsible for issuing licenses and permits for projects of renewable energy sources

Step 1
Kosovo Business Registration Agency (www.arbk.org)
- Business Registration

Step 2
Ministry of Environment and Spatial
Planning(http://mmph.rks-gov.net/)
- Environmental protection permit
- Water exploitation permit(if hydropower)
- Construction permit (above 20MW installed capacity)

Step 3
Permits depending on the construction location
- Kosovo Forestry Agency (if forest)
- Ministry of Culture, Youth and Sport (if special interest/
archeological zones)

Step 4
Ministry of Infrastructure (http://mi-ks.net/)
- Connection to existing road infrastructure permit

Step 5
Municipalities
- Construction permit(below 20MW of installed capacity)
- Contract for using the land

Step 6
KEK (www.kek-energy.com/)
- Authorization for connection to Energy Distribution System
- Contract of energy purchasing from suppliers. In case of
feed in tariffs, public supplier.

Step 7
Energy Regulatory Office (www.ero-ks.org/)
-Authorization for energy generation

Feed-in Tariffs
Feed-in Tariffs applicable for electricity produced from
renewable energy sources and admitted to the Support
Scheme.

Primary renwewabkle energy source   

(€/MW)  

HPPs (<10MW)  

63.3 

Wind    

85.0 

Solar Energy   

j/a 

Biogas and Biomass   
71.3